University of Idaho - I Banner
A student works at a computer

VandalStar

U of I's web-based retention and advising tool provides an efficient way to guide and support students on their road to graduation. Login to VandalStar.

Contact

Mailing Address:

875 Perimeter Dr. MS2281
Moscow, ID 83844-2281

For fire or life threatening emergencies - call 911 from any phone.

For assistance after business hours contact Campus Security at 208-874-7550.

Phone: 208-885-6246

Email: facilities@uidaho.edu

Project and Construction Information

Welcome! Key details about construction and area roadwork are highlighted on this page — to keep the Vandal community informed. Thank you for your patience while U of I works hard to improve its infrastructure.

Project timelines are estimates subject to change depending on work progress. If you have any questions or concerns about the listed projects, please contact U of I Facilities at facilities@uidaho.edu or 208-885-6246.

Energy Plant Micro-Turbines

Installation of three backpressure steam turbines to produce electrical power on campus using woody biomass fuel.

Learn More (PDF)

IRIC Solar Array Installation

Installation of a 147kW photovoltaic array on the roof of the IRIC building, capable of offsetting a significant amount of the building’s electrical load.

Learn More (PDF)

Menard Law Building

Renovation of the entry steps, planters, handrails and the lighting systems as well as adding a ramp to provide universal access to this entrance of the building.

Learn More (PDF)

Buildings Re-roof

Replacement of existing roof systems at the Library, Holm Research Center, McClure Hall, and Agricultural Biotechnology.

Learn More (PDF)

Campus Drive/Admin Circle & South Academic Mall Improvements

Changes to these two areas to improve the pedestrian character and "walkability" of campus, provide for code compliant access of fire response apparatus, while preserving and enhancing the university's built environment and Olmsted legacy.

Learn More (PDF)

ICCU Arena

State-of-the-art basketball arena constructed with Idaho wood products using mass timber construction.

Learn More (PDF)

Seed Potato Building

CKA Architects have developed the Seed Potato facility plans. Construction begins August 24, just to the north of Facilities building.

Learn More (PDF)

7th Street Pedestrian Mall

One block stretch of 7th St beginning at Pitman Ctr repurposed to a pedestrian priority mall with enhanced paving’s, appropriate landscaping and street furniture.

Learn More (PDF)

Contact

Mailing Address:

875 Perimeter Dr. MS2281
Moscow, ID 83844-2281

For fire or life threatening emergencies - call 911 from any phone.

For assistance after business hours contact Campus Security at 208-874-7550.

Phone: 208-885-6246

Email: facilities@uidaho.edu