Project Description:
The widening and realignment of Rout 95 entails some realignment of the Route 58 intersection. Depending on the relocation chosen for Route 58, there will be several bridges required. The most likely scenario will be three bridges - . 95/58, 95/Rock Creek, and 58/Rock Creek. Box culverts may be explored as an alternate possibility for one, or more, or the crossings. This project will include some hydraulic analysis, roadway relocation design, and bridge design. Up to three groups may be involved, one for each bridge site. The available site data is metric in InRoades, rather than AutoCAD format. InRoads is available in the BEL 117 computer lab.
|