Project Description:
King Cove Access is a 17 mile, single land gravel road in mountainous terrain with turnouts required every 1000 feet, two hovercraft terminals, and multiple bridges in the Aleutian Islands. Design needs to be completed for the road, turnouts, temporary and permanent signing, retaining walls (if necessary), hovercraft terminal and maneuvering pad. The hovercraft terminal will include design of water supply, sewage collection and disposal yard lighting, and fencing with a gate.
|